B. Beams were sanded ready for painting. Blue barrels were filled with water to 2000 pounds and hung from each beam for 48 hours. Beams were tested not only for load capacity but elastic ability to recover from loads. Each beam passed with flying colors. Testing done by JAI International Structural Engineers.