- A. Major termite and rot damage to main carrier beams.
- B.
- C. Termite damage to fascia beams.
- D. Some wood damage is sealed using high strength polyester paste prior to injection.
- F. Beam in the process of injection plastic drop cloth is hung to catch drips.
- G. Wood boards with pvc plastic liner are used to mold heavily damaged members.
- H. Damaged fascia boards sealed with polyester paste and injected.
- I. Forms are stripped and surfaces are sanded.
- J. Spot high strength polyester paste is used to finish off any surface defects.
- K. Right side of library beams finish painted.
- L. Long cafeteria corridor perimeter beams injected and finish sanded ready for paint.
- M. Left side library beams finish painted.











